Hancock County Jail – Greenfield, IN

Introduction

Equinor’s 2012 award of the first spar platform for its Aasta Hansteen field development in the northern Norwegian Sea provided the first opportunity to build a floating platform with steel catenary risers and a large volume hull condensate storage in this area. The contract, awarded to a consortium composed of Technip Energies and Hyundai Heavy Industries (HHI), covers engineering, procurement, construction and transportation of the spar hull and its mooring systems at a depth of about 1,300 m (4,250 ft).

Project management, engineering and procurement were based in Houston, Texas, USA and fabrication in HHI’s Ulsan fabrication yard in South Korea. After the heavy lift vessel transport to Norway, the spar was offloaded, upended, ballasted and then installed in a temporary mooring for the final commissioning scope of work.

Nor again is there anyone who loves or pursues or desires to obtain pain itself because painbut because occasionally circumstances occur which toil and pain can procure some great pleasure. To take a trivial example, which of us ever undertakes laborious physical exercise

Project Details

Clients : Martin Mars

Project Date : 14 Sep 2006

Location : South Korea

Avenue End Date : 05 May 2006

Price After : 710754$

Related project

Let’s See Popular Projects

Industry Water Access

Resurgent inflation and supply chain disruption stiffen the headwinds facing an industry that…

BAPCO refinery

IntroductionThe project involves a major expansion and upgrade of the Sitra oil facility,…

Epicerol® technology

IntroductionEpicerol® is a breakthrough technology with respect to conventional propylene-based processes and presents…